What Will Be On New PJM Lines?

8/25/2023

0 Comments

 
PJM Interconnection is the grid planner for the Mid-Atlantic region.  PJM's job is to keep the grid reliable and the electricity markets competitive.  When load increases in PJM's region without a corresponding increase in generation of electricity, reliability suffers.  When reliability is threatened, PJM springs into action and plans new transmission to solve the impending crisis.  If PJM did not act, we'd soon experience brown outs and black outs and the whole PJM system would crash.  The most logical solution for PJM would be to order new generation near sources of increased load.  However, PJM cannot order new generation, it can only order new transmission.  Electric generation is a market-based, competitive endeavor.  If demand increases prices in a certain load pocket, then the generation market receives a signal that it would be profitable for new generation to build for that load.  It works, in theory, but sadly not in practice.  PJM's  reliability focused transmission planners never let the market work to spur new generation.  When prices increase, or reliability issues crop up on the horizon, PJM orders new transmission to solve the problem before any new generators are even contemplated.  PJM complains about the loss of baseload generation without replacement, but fails to acknowledge its own role in creating the problem.

Over the past decade or so, Northern Virginia has become the data center capital of the country.  Data centers use a LOT of electricity.  This recent article says that Amazon data centers in Northern Virginia use half as much electricity as New York City every day, and 35% more than the entire power grid of the company's hometown city of Seattle.  That's a huge electric load currently being built out in Northern Virginia without a corresponding increase in electric generation.  PJM says the data centers are creating a reliability issue and it has opened a request for proposals to solve it using transmission.  The goal is to export a whole bunch of electricity to Northern Virginia, and PJM's utility members wasted no time in creating new transmission lines that would connect the generators they own to Northern Virginia.
Picture
One such proposal from FirstEnergy envisions two new 500kV lines from West Virginia to a substation in Frederick County, Maryland.  Other utilities have proposed new lines from that substation to Northern Virginia, completing the new extension cords.

Extension cords are exactly what these new transmission lines are.  They plug in at struggling FirstEnergy-owned electric generators in West Virginia and provide a pathway for additional electricity generated in West Virginia to power the data centers in Northern Virginia.

The map shows the northern line of this proposal beginning at Fort Martin, West Virginia.  Fort Martin is the location of FirstEnergy's coal-fired Ft. Martin Power Station.
Picture
The plant uses more than 2.8 million tons of coal annually and at full capacity the plant’s generating units can produce more than 26 million kilowatt-hours of electricity daily.  Read more here. 

Of course, nobody wants coal-fired electricity any more and FirstEnergy has been toying with closing or selling some of these plants.  And then the PJM serendipity fairy arrived!  PJM needs transmission to bring a new supply of power to No. Va., and FirstEnergy can bolster the future economic success of its failing generators by connecting it to data center load.  And FirstEnergy's proposal was born.

The southern line of FirstEnergy's proposal is shown on the map as beginning at Pruntytown, WV.  Pruntytown is a gigantic substation where many electric generators in the area connect to the grid.  One such plant is FirstEnergy's Harrison Power Station in Haywood, West Virginia.

Picture
Harrison uses more than five million tons of coal annually and at full capacity the plant’s generating units can produce over 47 million kilowatt-hours of electricity daily.  Read more about Harrison here.  FirstEnergy's bottom line wins again with this proposal!

But did anyone ask Northern Virginia if they wanted to import dirty coal-fired electricity from West Virginia to power their data centers?  PJM?  FirstEnergy?  Dominion?  These entities are going to have a really hard time selling this to a community with clean energy goals and aspirations.  The D.C. metro area is so worried about climate change that they have closed many fossil fuel generators in their own neighborhoods.  Why would these people just look the other way and shrug about increasing their carbon footprint every time they turn on the light switch?  Would local governments in Northern Virginia keep approving new data centers that need power if they knew they were increasing regional air pollution?  Where's the tipping point here?

In addition to the burning of more coal to produce more electricity in West Virginia, FirstEnergy's proposals also plan on hundreds of miles of new transmission rights of way across private property between West Virginia and Northern Virginia.  None of these affected landowners need this new electric supply.  It's simply passing through on its way to corporate users in D.C.'s growing urban sprawl.

Of course, FirstEnergy's proposal is only one of 72 that PJM received.  Other utilities have proposed connecting their nuclear and gas fired power stations in south eastern Pennsylvania to the data center load via new transmission lines.  Numerous proposals begin at the Peach Bottom Atomic Power Station in Delta, PA and the gas-fired York Energy Center in the same town.  Still other proposals want to connect the data center load to American Electric Power's massive 765kV transmission system in the Ohio Valley, where numerous fossil fuel plants are struggling to survive.  See the 765 lines on this map:

Picture
The endpoint of AEP's 765kV system in Virginia is at a substation called Joshua Falls.  New lines beginning at Joshua Falls connect to the data center load as shown on this proposal map submitted to PJM by AEP subsidiary Transource.
Picture
Northern Virginia communities need to go into this new power supply for their data centers with their eyes wide open.  Are all the "benefits" they are receiving from the massive data center build out worth increasing their carbon footprint?  Why are other communities in rural areas hundreds of miles from the data centers being forced to sacrifice their land and in some instances, the very air they breathe, so that Northern Virginia counties can increase their tax revenue and their sprawl?  If these counties are receiving all the benefits from the data center buildout, shouldn't they also step up and shoulder the negative impacts by building new coal, gas, and nuclear power stations in their own communities?

There has to be a better solution than this!
0 Comments



Leave a Reply.

    About the Author

    Keryn Newman blogs here at StopPATH WV about energy issues, transmission policy, misguided regulation, our greedy energy companies and their corporate spin.
    In 2008, AEP & Allegheny Energy's PATH joint venture used their transmission line routing etch-a-sketch to draw a 765kV line across the street from her house. Oooops! And the rest is history.

    About
    StopPATH Blog

    StopPATH Blog began as a forum for information and opinion about the PATH transmission project.  The PATH project was abandoned in 2012, however, this blog was not.

    StopPATH Blog continues to bring you energy policy news and opinion from a consumer's point of view.  If it's sometimes snarky and oftentimes irreverent, just remember that the truth isn't pretty.  People come here because they want the truth, instead of the usual dreadful lies this industry continues to tell itself.  If you keep reading, I'll keep writing.


    Need help opposing unneeded transmission?
    Email me


    Search This Site

    Got something to say?  Submit your own opinion for publication.

    RSS Feed

    Archives

    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    February 2012
    January 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011
    February 2011
    January 2011
    December 2010
    November 2010
    October 2010
    September 2010
    August 2010
    July 2010
    June 2010
    May 2010
    April 2010
    March 2010
    February 2010
    January 2010

    Categories

    All
    $$$$$$
    2023 PJM Transmission
    Aep Vs Firstenergy
    Arkansas
    Best Practices
    Best Practices
    Big Winds Big Lie
    Can Of Worms
    Carolinas
    Citizen Action
    Colorado
    Corporate Propaganda
    Data Centers
    Democracy Failures
    DOE Failure
    Emf
    Eminent Domain
    Events
    Ferc Action
    FERC Incentives Part Deux
    Ferc Transmission Noi
    Firstenergy Failure
    Good Ideas
    Illinois
    Iowa
    Kansas
    Land Agents
    Legislative Action
    Marketing To Mayberry
    MARL
    Missouri
    Mtstorm Doubs Rebuild
    Mtstormdoubs Rebuild
    New Jersey
    New Mexico
    Newslinks
    NIETC
    Opinion
    Path Alternatives
    Path Failures
    Path Intimidation Attempts
    Pay To Play
    Potomac Edison Investigation
    Power Company Propaganda
    Psc Failure
    Rates
    Regulatory Capture
    Skelly Fail
    The Pjm Cartel
    Top Ten Clean Line Mistakes
    Transource
    Valley Link Transmission
    Washington
    West Virginia
    Wind Catcher
    Wisconsin

Copyright 2010 StopPATH WV, Inc.