StopPATH WV
  • News
  • StopPATH WV Blog
  • FAQ
  • Events
  • Fundraisers
  • Make a Donation
  • Landowner Resources
  • About PATH
  • Get Involved
  • Commercials
  • Links
  • About Us
  • Contact

Sierra Club's Electric Transmission Hypocrisy Finally Catches Up to Them

8/19/2014

3 Comments

 
Yesterday, Sierra Club announced that it opposes PPL's "Project Compass," at least the parts that it thinks will carry "dirty" energy.
Jeff Tittel, director of the New Jersey chapter of the Sierra Club, said his group "will definitely oppose" the section in that state.

Tittel said the Sierra Club's opposition is "absolutely" a challenge to the existing business model for utilities, which often rely on far-off plants to send power into populated areas.

Tittel said the PPL proposal is like "frack by wire" because the proposed route across northern Pennsylvania would encourage new power plants fueled by hydraulically fractured Marcellus Shale gas.
But what about the sections that environmental NGOs think will carry "clean" wind energy from the Midwest?  How is Sierra Club going to support the western parts of this project without connecting them to the eastern parts that deliver the load?
Tom Schuster, a regional Sierra Club representative, said the group hasn't taken a position on the entire project because there are still too many unknowns.
Meanwhile in Midwest states, Sierra Club is supporting new transmission lines intended to move electricity hundreds of miles across multiple states.  Aren't those also transmission lines that rely on far-off plants to send power into populated areas?  Yes, they are.
Environmentalists who testified said they support the [Grain Belt Express] plan. James Harmon of Kirksville, a member of the executive committee of the Sierra Club’s Missouri Chapter, said it would help Missouri and other states meet the new federal goals for reducing carbon emissions.
DILEMMA!

This is what happens when your policies are hypocritical.  Either you like big new transmission "for wind" (and everything else they carry), or you don't.  There are no "electron police" standing by to keep dirty electrons off new transmission lines.
Hello, left hand... let me introduce you to right hand.  May you two have a long and hypocritical life together!

So, how does Sierra Club want to plan our electric grid?  This is what happens when you let a bunch of "public policy" wonks have a seat at the table.  It doesn't sound like there's any real plan at work here.

Meanwhile, equally silly arguments about "mine mouth" gas plants hijack
the reporter's attention:
Jay Apt, director of the Carnegie Mellon University Electricity Industry Center, said that enormous natural gas production from the Marcellus Shale has led to significantly cheaper wholesale prices in areas of drilling. In other words, a power plant could produce electricity cheaply in Pennsylvania and a utility could transmit it to places with higher electric prices, such as Maryland, New York, and New Jersey.
Ever heard of a gas pipeline, Jay?  Gas can be transported to plants that burn it in places with higher electric prices.  You're going to have to transport something somewhere, and what's easier to get permitted?  A FERC-jurisdictional gas pipeline, or a state-jurisdictional 725-mile high voltage transmission line that meanders through four very urban states?  We all know that FERC has never met a gas pipeline it didn't like.
PJM says what it always says -- because when the only tool you have is a hammer, everything looks like a nail.  PJM never changes, no matter how many new rules get made.  PJM simply finds a way to bend the new rules to continue to support its generation and transmission incumbents.
PJM Interconnection of Audubon, Pennsylvania, which oversees wholesale electric demand for 61 million customers in a 13-state mid-Atlantic region, has said that the electric grid is "undergoing an extraordinary transformation" as coal-fired plants retire.

 PJM could approve all, part, or none of the PPL plan, but regulators agree that the region needs transmission upgrades to ensure reliable and affordable electric service. Allentown-based PPL said the line would take about a decade to build.
Dotter goes... doddering... on making silly analogies:
PJM spokesman Ray Dotter said it's like a huge version of the dilemma many individuals face: Is the most effective thing to buy a new car, or fix the old one you have?
The PPL plan is like the new car choice. PJM will review the proposal and is likely to vote on it in November or December, and is also considering numerous smaller projects from other utilities.
So, if PJM decides to buy PPL a new car, are they planning to trade in the old car?  Or do PJM and PPL intend to continue driving that old, inefficient car AND the brand new one?  New transmission that ignores current inefficiencies and outdated equipment simply adds to the problem, it does not solve it.

Then Tittel says something sensible:
"We have better places to invest our energy money" in or near in New Jersey, Tittel said, such as offshore wind, solar, and energy efficiency projects. He added that if money was spent in those ways "you wouldn't need the power line."
I hope this means that Tittel will now be supporting smart, new local transmission projects in New Jersey!

But, just in case the Sierra Club simply continues to flap its arms ineffectually and contradict itself, the citizens of the affected states will most likely be the REAL opposition that kills PPL's transmission project.

The citizens have each other's back, because they can't count on organizations like the Sierra Club to deliver a coherent message about new electric transmission.

We always show up to get the job done!

So, with that in mind, PJM wants to hear your comments about "Project Compass."  Tell them what you think.
3 Comments
Morgan Kinder
8/21/2014 08:59:16 am

It's understanable New England states are energy deficient. It's kind of the end of the line for pipelines and a major urban center. They partially rely on heating oil when the rest of the country has abandoned it a long time ago. Like Europe, they are dependent on Vladimir Putin for Compressed Natural Gas. Last winter electricity generators had to shut down so residents could use natural gas for heating.

I've read where NE-ISO recommends transmission to the Midwest for renewable energy. That seems real foolish when what they really need is the diversity of more natural gas. Manufacturing needs cheap energy, not high priced energy from transmission from a land far far away.

I don't support unnecessary utility projects, but it would seem a pipeline provides more versatility than transmission. As a Midwest farmer with multiple pipelines through fields, I would much rather see an additional pipeline project headed east, than a transmission project. A natural gas pipeline will encourage more manufacturing jobs out east.

Paying excessively for energy made by Midwest wind discourages economic growth at the destination.

Reply
Morgan
8/21/2014 09:01:52 am

There is a lot of truth in that song. FERC is a rubberstamp machine. While effectively corny, that song does stick in my head. I need to share it with some of my Houston friends.

Reply
Spurwing Plover
6/11/2015 11:52:47 am

Sierra Club especialy to their Grand Exualted poo poo head Carl Pope please stop lecturing to us about energy conservation and this Earth Hour poppycock

Reply



Leave a Reply.

    About the Author

    Keryn Newman blogs here at StopPATH WV about energy issues, transmission policy, misguided regulation, our greedy energy companies and their corporate spin.
    In 2008, AEP & Allegheny Energy's PATH joint venture used their transmission line routing etch-a-sketch to draw a 765kV line across the street from her house. Oooops! And the rest is history.

    About
    StopPATH Blog

    StopPATH Blog began as a forum for information and opinion about the PATH transmission project.  The PATH project was abandoned in 2012, however, this blog was not.

    StopPATH Blog continues to bring you energy policy news and opinion from a consumer's point of view.  If it's sometimes snarky and oftentimes irreverent, just remember that the truth isn't pretty.  People come here because they want the truth, instead of the usual dreadful lies this industry continues to tell itself.  If you keep reading, I'll keep writing.


    Need help opposing unneeded transmission?
    Email me


    Search This Site

    Got something to say?  Submit your own opinion for publication.

    RSS Feed

    Archives

    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    February 2012
    January 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011
    February 2011
    January 2011
    December 2010
    November 2010
    October 2010
    September 2010
    August 2010
    July 2010
    June 2010
    May 2010
    April 2010
    March 2010
    February 2010
    January 2010

    Categories

    All
    $$$$$$
    2023 PJM Transmission
    Aep Vs Firstenergy
    Arkansas
    Best Practices
    Best Practices
    Big Winds Big Lie
    Can Of Worms
    Carolinas
    Citizen Action
    Colorado
    Corporate Propaganda
    Data Centers
    Democracy Failures
    DOE Failure
    Emf
    Eminent Domain
    Events
    Ferc Action
    FERC Incentives Part Deux
    Ferc Transmission Noi
    Firstenergy Failure
    Good Ideas
    Illinois
    Iowa
    Kansas
    Land Agents
    Legislative Action
    Marketing To Mayberry
    MARL
    Missouri
    Mtstorm Doubs Rebuild
    Mtstormdoubs Rebuild
    New Jersey
    New Mexico
    Newslinks
    NIETC
    Opinion
    Path Alternatives
    Path Failures
    Path Intimidation Attempts
    Pay To Play
    Potomac Edison Investigation
    Power Company Propaganda
    Psc Failure
    Rates
    Regulatory Capture
    Skelly Fail
    The Pjm Cartel
    Top Ten Clean Line Mistakes
    Transource
    Washington
    West Virginia
    Wind Catcher
    Wisconsin

Copyright 2010 StopPATH WV, Inc.