Real Economics Accomplishes What PJM's Artificial Markets Cannot

11/20/2012

0 Comments

 
One of PJM Interconnection's purposes is to provide reliable power at the lowest possible price.  As part of its attempt to accomplish this goal, PJM plans for transmission "enhancement" and administers an artificial market construct that is supposed to foster competitiveness that will ensure market prices for electricity are "the lowest possible."

Although PJM can order new transmission to artificially adjust electricity markets, they cannot order new generation to shape the market.  This unbalanced "market" is what set up the investor owned incumbent utility transmission feeding frenzy we've had to put up with over the past few years.  Instead of ordering new economic generation near load, PJM orders expensive new transmission lines that source from existing generation farther from load.  PJM believes that "the market" (that is the REAL economic market, not PJM's artificially constructed and controlled market) will stimulate new generation without interference.  However, PJM will not rely on "the market" to drive transmission expansion.  If they did, would the lights go out while we wait for "the market" to catch up?  PJM thinks so.

Because PJM cannot order new generation, the states of New Jersey and Maryland took matters into their own hands and ordered new generation in their own states.  This upset PJM, the Market Monitor, and the incumbent generators, who have been scheming to actually prevent new generation.  So much for allowing "the market" to encourage new generation.

PJM "ordered" four new high capacity long distance transmission lines between 2006 and 2008 in order to increase the use of coal-fired resources.  These lines were supposed to bring lower cost electricity to the east coast, instead of waiting for "the market" to encourage new east coast generation.

The lines were economic projects, designed to decrease the "congestion" on existing lines that prevented the import of additional coal fired generation to the east coast during peak load.  However, PJM also floated these projects as reliability projects, insisting that eastern load would continue to attempt to draw cheap coal fired power from the west over congested lines until the lines simply overheated and failed, pitching the entire region into the dark.  That would never have happened because the east coast had plenty of their own generation, albeit more expensive (at the time) gas fired generation, that would increase prices when relied on to support peak load.

In order to decrease prices on the east coast through the building of these new lines, the cost of the lines is shared by all consumers in the entire PJM region.  The east coast only paid a fraction of the cost of the lines that lowered their prices.  And, in fact, the lowering of prices on the east coast by building new transmission actually increased prices in the western region by providing new markets for previously constrained generation.  Eliminating "congestion" serves to levelize prices between different markets.

But, something amazing happened between 2006 and 2012.  Demand for electricity on the east coast tanked due to increased energy efficiency and demand side management.  By shaving peak load, the east coast made great strides to solving the "problem" of not having access to cheaper, western coal fired generation.  Something else happened during that time as well.  Shale gas flooded the market, opening up a cheap, plentiful, new supply of natural gas that lowered the cost of previously expensive gas fired generation on the east coast and motivated new gas fired generation builds near east coast load.

The combination of decreased load and more economic east coast generation completely obviated PJM's "need" for the four new transmission lines.  Unfortunately, TrAIL had already been built at enormous cost and personal sacrifice by the people of West Virginia.  However, two other projects, PATH and MAPP, have finally been abandoned by PJM and won't be built.  But, the PJM consumers will still pay for these abandoned projects they never wanted and no longer need.  PJM's transmission planning has failed on a massively expensive scale.

But I've only accounted for three of the four projects thus far.  The last one is PSEG & PPL's struggling Susquehanna Roseland project in Pennsylvania and New Jersey.  Although there is no economic or reliability need for this project anymore either, the project owners and PJM continue to insist on constructing it at enormous cost to consumers, landowners and the citizens who own the Delaware Water Gap National Recreation Area.

PSEG & PPL read the economic writing on the wall over the past few years and stepped up their efforts to ramrod their project into reality by making it "too big to fail" even though the economic justification for it had evaporated.  The companies still claim that S-R "will save consumers $200M per year in congestion costs," therefore it is urgently needed and justifies enormous cost that will raise electric prices, take land from property owners, force those living in close proximity to risk their health being bathed in the line's continuous EMF soup, and destroy a priceless and irreplaceable national park.

In order to do so, PSEG & PPL bribed towns and landowners with "mitigation" payments and began a lobbying program that reached all the way to the White House with the goal of obtaining the approval of the National Park Service.  The cost of all this, of course, will be borne by all consumers in PJM.

Last week, I watched FERC Commissioner Moeller extoll the virtues of new transmission while disparaging the efforts to hinder Susquehanna Roseland, a project that "would save consumers $200M a year in congestion costs," according to Commissioner Moeller.

So, where did that congestion figure come from?  PJM and the project owners floated it at the time the project was approved, many years ago.  Does that figure still bear any resemblance to reality?  No. The "congestion" driving S-R has evaporated.  The building of S-R will actually cost consumers more than any subset of consumers will ever save on their electric bills.  Whether or not there is a "reliability" need for this project I really can't say, but if there is one, a simple rebuild of the existing line may suffice to fill that void.  S-R as planned is overkill.

Every quarter PJM's Market Monitor publishes a "State of the Market" report.  The one for the third quarter of 2012 was released the other day.  The report has a section about "congestion."  If S-R was still going to save consumers "$200M per year" that information would show up in the report.  It does not.

The SOM report says, "The AP South interface was the largest contributor to congestion costs in the first nine months of 2012. With $50.9 million in total congestion costs, it accounted for 12.0 percent of the total PJM congestion costs in the first nine months of 2012.
The top five constraints in terms of congestion costs together contributed $112.5 million, or 26.5 percent, of the total PJM congestion costs in the first nine months of 2012. The top five constraints were the AP South interface, Graceton – Raphael Road transmission line, Woodstock flowgate, Belvidere – Woodstock line and Clover transformer."


None of these congestion contributors is located anywhere near the Susquehanna Roseland project area.  And the biggest contributor to congestion costs is $50.9M per year, not $200M.

The SOM report also provides a nifty map on page 221 that shows congestion points.  There's no congestion showing up in the geographic area where S-R is being constructed.

Need and justification for Susquehanna-Roseland have completely evaporated.  If the project is abandoned now, or reconfigured to more closely align with any actual need, the cost to consumers will be dramatically lowered.  Stop constructing this project now.  Just stop.  Consumers can't afford PJM's artificial markets and planning failures any longer.  Stop it.
0 Comments



Leave a Reply.

    About the Author

    Keryn Newman blogs here at StopPATH WV about energy issues, transmission policy, misguided regulation, our greedy energy companies and their corporate spin.
    In 2008, AEP & Allegheny Energy's PATH joint venture used their transmission line routing etch-a-sketch to draw a 765kV line across the street from her house. Oooops! And the rest is history.

    About
    StopPATH Blog

    StopPATH Blog began as a forum for information and opinion about the PATH transmission project.  The PATH project was abandoned in 2012, however, this blog was not.

    StopPATH Blog continues to bring you energy policy news and opinion from a consumer's point of view.  If it's sometimes snarky and oftentimes irreverent, just remember that the truth isn't pretty.  People come here because they want the truth, instead of the usual dreadful lies this industry continues to tell itself.  If you keep reading, I'll keep writing.


    Need help opposing unneeded transmission?
    Email me


    Search This Site

    Got something to say?  Submit your own opinion for publication.

    RSS Feed

    Archives

    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    February 2012
    January 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011
    February 2011
    January 2011
    December 2010
    November 2010
    October 2010
    September 2010
    August 2010
    July 2010
    June 2010
    May 2010
    April 2010
    March 2010
    February 2010
    January 2010

    Categories

    All
    $$$$$$
    2023 PJM Transmission
    Aep Vs Firstenergy
    Arkansas
    Best Practices
    Best Practices
    Big Winds Big Lie
    Can Of Worms
    Carolinas
    Citizen Action
    Colorado
    Corporate Propaganda
    Data Centers
    Democracy Failures
    DOE Failure
    Emf
    Eminent Domain
    Events
    Ferc Action
    FERC Incentives Part Deux
    Ferc Transmission Noi
    Firstenergy Failure
    Good Ideas
    Illinois
    Iowa
    Kansas
    Land Agents
    Legislative Action
    Marketing To Mayberry
    MARL
    Missouri
    Mtstorm Doubs Rebuild
    Mtstormdoubs Rebuild
    New Jersey
    New Mexico
    Newslinks
    NIETC
    Opinion
    Path Alternatives
    Path Failures
    Path Intimidation Attempts
    Pay To Play
    Potomac Edison Investigation
    Power Company Propaganda
    Psc Failure
    Rates
    Regulatory Capture
    Skelly Fail
    The Pjm Cartel
    Top Ten Clean Line Mistakes
    Transource
    Valley Link Transmission
    Washington
    West Virginia
    Wind Catcher
    Wisconsin

Copyright 2010 StopPATH WV, Inc.