Prepare for Transmission Permitting Chaos!

9/6/2025

0 Comments

 
Picture
The Third Circuit Court of Appeals issued a Precedential Opinion yesterday in a case that has drawn an enormous amount of attention in the electric regulatory world, but little notice from everyone else.

Transource Pennsylvania LLC v. Steven DeFrank concerns the Public Utility Commission of Pennsylvania's denial of a Certificate to construct the Transource project in the state.  After losing, Transource claimed that the PUC was prohibited from making a finding that the project wasn't needed because it must simply accept the finding of need issued by PJM Interconnection.

I wrote about this at the end of last year, after listening to the Oral Argument where the state could hardly get a word in edgewise because the Court simply didn't want to hear it.  The Opinion was about what I expected.

The Court confused FERC's jurisdiction to set interstate transmission RATES with PJM's transmission planning finding that the Transource project would lower rates for consumers in Washington, DC and Baltimore.  PJM does not set rates, therefore their project planning does not set rates.  Only FERC can do that.

What FERC cannot do is site and permit a transmission project that is not within a National Interest Electric Transmission Corridor.  Transource is not within such a corridor.  PJM is under the regulatory authority of FERC, therefore, the Court reasoned, PJM's planning is an extension of FERC's jurisdiction to set rates.  Faulty logic.

Transmission siting and permitting is state jurisdictional.  That means that the states have the final say on whether or not a project planned by PJM is approved, sited, and issued a permit to construct.

The Court has effectively neutered state jurisdiction and taken away their ability to make a determination whether the project is needed.  The only thing left for the state to do is decide where the project goes.  This gives undue authority to PJM over transmission permitting, and obliterates due process for landowners impacted by the new transmission project.

The Court says that states (and presumably others impacted) can challenge PJM's planning process and determination of need at FERC, therefore their due process rights are not impacted.

However, this is not the bargain states have struck with the federal government about transmission permitting.  States have historically followed state law when it comes to need determinations, and state law usually requires the utility commission to make a finding of need when permitting a project.  Pennsylvania's law is explicit that the PUC must decide whether the project is needed.  Other states get there in different ways.  West Virginia's law says:
...the commission may approve the application if it finds that the proposed transmission line:
(1) Will economically, adequately and reliably contribute to meeting the present and anticipated requirements for electric power of the customers served by the applicant or is necessary and desirable for present and anticipated reliability of service for electric power for its service area or region;
(2) Will be in the best interest of West Virginia customers and its citizens; and
(3) Will result in an acceptable balance between reasonable power needs and reasonable environmental factors.
There it is under (1)... is necessary...

But now West Virginia is prohibited from making a finding that the transmission line is not necessary.  West Virginia must simply accept PJM's determination that it is.

Maybe this would work out great if PJM was actually a place where competing opinions were accepted and where an impartial adjudicator listened to both sides before making a decision whether or not a project is needed.  But PJM is not that place.  Anyone who has attended a PJM planning meeting knows that it's a one-way ride on the authoritarian train where you can't pull a cord to stop the train.  PJM makes decisions in a closed environment and rejects any dissent.  Therefore, the only avenue open for states or other parties who do not agree with PJM's findings is to make a complaint at FERC.  FERC does not examine each project that PJM approves to assure it's needed.  PJM has a big book of rules that are approved by FERC.  As long as PJM follows its rules, then FERC just goes along for the ride.  However now FERC is going to be examining all PJM's need data on a case-by-case basis for each transmission project PJM approves.  FERC doesn't have time for that and the delays for new transmission are going to be astronomical while FERC spins its wheels examining each need determination in detail to make sure it agrees with PJM's rules.  No more rubber stamping!

In addition, the tension between PJM and states is thick right now.  PJM doesn't need this additional irritation.  It could be the burr under the saddle that finally prompts PJM states to exit PJM for good.  PJM isn't planning anything in your state if its not a member of PJM.

In addition, states are going to plow new ground creating a meaning for the word "permit".  States have authority to site and permit.  What does that mean?  It means not only does the state decide where the project goes, it also decides whether the project goes.  Don't underestimate what the states can do to find ways to deny transmission applications on any other basis but need.  What then?  Will a court keep whittling away on state authority to permit transmission?

This Opinion is Pandora's Box.  Nothing good is going to come out of it except a whole lotta litigation and state refusal to approve new transmission applications.  Nobody likes to be told they must accept someone else's opinion without examining it.  Trust but verify.  That's what states have been doing for decades.

It remains to be seen whether the PA PUC will ask for hearing en banc, where the entire court (all the judges) takes another look at the decision, or whether the PA PUC will take their chances at the Supreme Court.

​This story is not over.
0 Comments



Leave a Reply.

    About the Author

    Keryn Newman blogs here at StopPATH WV about energy issues, transmission policy, misguided regulation, our greedy energy companies and their corporate spin.
    In 2008, AEP & Allegheny Energy's PATH joint venture used their transmission line routing etch-a-sketch to draw a 765kV line across the street from her house. Oooops! And the rest is history.

    About
    StopPATH Blog

    StopPATH Blog began as a forum for information and opinion about the PATH transmission project.  The PATH project was abandoned in 2012, however, this blog was not.

    StopPATH Blog continues to bring you energy policy news and opinion from a consumer's point of view.  If it's sometimes snarky and oftentimes irreverent, just remember that the truth isn't pretty.  People come here because they want the truth, instead of the usual dreadful lies this industry continues to tell itself.  If you keep reading, I'll keep writing.


    Need help opposing unneeded transmission?
    Email me


    Search This Site

    Got something to say?  Submit your own opinion for publication.

    RSS Feed

    Archives

    August 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    February 2012
    January 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011
    February 2011
    January 2011
    December 2010
    November 2010
    October 2010
    September 2010
    August 2010
    July 2010
    June 2010
    May 2010
    April 2010
    March 2010
    February 2010
    January 2010

    Categories

    All
    $$$$$$
    2023 PJM Transmission
    Aep Vs Firstenergy
    Arkansas
    Best Practices
    Best Practices
    Big Winds Big Lie
    Can Of Worms
    Carolinas
    Citizen Action
    Colorado
    Corporate Propaganda
    Data Centers
    Democracy Failures
    DOE Failure
    Emf
    Eminent Domain
    Events
    Ferc Action
    FERC Incentives Part Deux
    Ferc Transmission Noi
    Firstenergy Failure
    Good Ideas
    Illinois
    Iowa
    Kansas
    Land Agents
    Legislative Action
    Marketing To Mayberry
    MARL
    Missouri
    Mtstorm Doubs Rebuild
    Mtstormdoubs Rebuild
    New Jersey
    New Mexico
    Newslinks
    NIETC
    Opinion
    Path Alternatives
    Path Failures
    Path Intimidation Attempts
    Pay To Play
    Potomac Edison Investigation
    Power Company Propaganda
    Psc Failure
    Rates
    Regulatory Capture
    Skelly Fail
    The Pjm Cartel
    Top Ten Clean Line Mistakes
    Transource
    Valley Link Transmission
    Washington
    West Virginia
    Wind Catcher
    Wisconsin

Copyright 2010 StopPATH WV, Inc.