New FERC Transmission Permitting Rules

5/18/2024

0 Comments

 
Let's move on to FERC's new rules for permitting transmission projects in a National Interest Electric Transmission Corridor.  FERC also released this rule on Monday.  It's another instance of FERC batting away any constructive criticism and doubling down on a bad idea.  What's in the water down there anyhow?

If the U.S. Department of Energy designates a National Interest Electric Transmission Corridor, and a transmission project is planned for that corridor, first the transmission developer must attempt to get state permits for its project.  In the event that a state denies a permit for a project, then the transmission developer can go to FERC, denial in hand, and ask that FERC overrule the state and site and permit the transmission project anyhow.

This may be the situation with MARL, and any other transmission project that DOE creates a corridor for.

FERC was given authority to site and permit transmission as a "backstop" to state inaction back in 2005.  FERC subsequently created rules for its process to do so.  When Congress changed the "backstop" law in 2021 to allow FERC to permit even when a state denied a project, FERC released a rulemaking to update its process.  During the rulemaking, FERC received numerous comments on its proposed rule and suggestions to make it better.  Across the board, FERC rejected most of these changes.

If you find yourself in a situation where the project you oppose ends up before FERC, you're going to need to know the rules for participating in that process.

FERC made only one useful concession between its proposed rule and the final rule issued on Monday.   The proposed rule allowed a transmission developer to begin the pre-filing process at FERC at the same time it filed its applications with state commissions.  That idea, which was widely panned by states and landowners, would have required landowners to participate in the FERC process at the same time as the state process.  Two permitting processes, two sets of rules, two sets of lawyers, two sets of headache.  All with the knowledge that the FERC process would become unnecessary if the state approved the project.  A complete waste of time.  However, FERC dumped that proposed rule and now says that a developer cannot begin its pre-filing until one year AFTER it files its state applications.  This gives the state a year to complete its permitting before the FERC process begins.  At least you won't be engaging in two permitting processes at the same time.  However, FERC did not speak to landowners' question regarding whether the FERC process would proceed while state appeals are pending.  For instance, if a state denies, the transmission developer could appeal that denial in state court, instead of engaging in the more expensive and lengthy FERC process.  Conversely, if a state approved and the landowners appealed that decision, when would the FERC process begin?  This means that this process is still subject to being shaped in practice.

The part of FERC's new rule that is truly awful is its insistence that an "Applicant Code of Conduct" will ensure that the transmission owner has "made good faith efforts to engage with landowners and other stakeholders early in the permitting process" as required by the statute.h
FERC has turned this into a box-checking exercise, not an actual determination of whether the transmission developer has complied with any "Code", as specious as it is.  The "Code" is generalized garbage and anyone who has ever had to deal with a transmission developer land agent would be able to drive a truck through its many holes.  It's not like any "Code of Conduct" you've ever seen used on any transmission project.  In fact, it's so short and devoid of any landowner protections, I can copy the whole thing right here. Applications 
Ensure that any representative acting on the applicant’s behalf states their full name, title, and employer, as well as the name of the applicant that they represent, and presents a photo identification badge at the beginning of any discussion with an affected landowner, and provides the representative’s and applicant’s contact information, including mailing address, telephone number, and electronic mail address, prior to the end of the discussion.

Ensure that all communications with affected landowners are factually correct. The applicant must correct any statements made by it or any representative acting on its behalf that it becomes aware were:
(i) Inaccurate when made; or
(ii) Have been rendered inaccurate based on subsequent events, within three business days of discovery of any such inaccuracy.

Ensure that communications with affected landowners do not misrepresent the status of the discussions or negotiations between the parties. Provide an affected landowner upon request a copy of any discussion log entries that pertain to that affected landowner’s property.

Provide affected landowners with updated contact information whenever an applicant’s contact information changes.

Communicate respectfully with affected landowners and avoid harassing, coercive, manipulative, or intimidating communications or high-pressure tactics.

Except as otherwise provided by State, Tribal, or local law, abide by an affected landowner’s request to end the communication or for the applicant or its representative to leave the affected landowner’s property.

Except as otherwise provided by State, Tribal, or local law, obtain an affected landowner’s permission prior to entering the property, including for survey or environmental assessment, and leave the property without argument or delay if the affected landowner revokes permission.

Refrain from discussing an affected landowner’s communications or negotiations status with any other affected landowner. 

​Provide the affected landowner with a copy of any appraisal that has been prepared by, or on behalf of, the applicant for that affected landowner’s property, if any, before discussing the value of the property in question.  
That's all the "protection" you get.  As long as a transmission developer files this and says it will follow it, then the box is checked and the transmission developer is "acting in good faith" no matter what it does.  "Avoiding" certain behavior is not the same as prohibiting it.  

Compare this crappy "protection" to what a group of experienced transmission opponents asked FERC to do in their comments.
impacted_landowner_comments.pdf
File Size: 620 kb
File Type: pdf
Download File

You can expect to experience the same things landowners described in their comments, not FERC's rosy "landowner protections," which do little to actually protect landowners.  FERC believes that its "success" permitting natural gas pipelines will ensure landowners are treated fairly in the process.  If FERC's future permitting of electric transmission lines is anything like it's prior permitting for natural gas pipelines, we'd all better learn the words to this song:
FERC has chosen to become, in the words of Impacted Landowners, "...just another flashpoint that draws protestors to the Commission’s headquarters because the people understand they have been stripped of the last vestige of any fair process to defend their rights by a federal agency captured by the industry it is supposed to regulate."

​See you at FERC, friends.  Bring your singing voice!
0 Comments



Leave a Reply.

    About the Author

    Keryn Newman blogs here at StopPATH WV about energy issues, transmission policy, misguided regulation, our greedy energy companies and their corporate spin.
    In 2008, AEP & Allegheny Energy's PATH joint venture used their transmission line routing etch-a-sketch to draw a 765kV line across the street from her house. Oooops! And the rest is history.

    About
    StopPATH Blog

    StopPATH Blog began as a forum for information and opinion about the PATH transmission project.  The PATH project was abandoned in 2012, however, this blog was not.

    StopPATH Blog continues to bring you energy policy news and opinion from a consumer's point of view.  If it's sometimes snarky and oftentimes irreverent, just remember that the truth isn't pretty.  People come here because they want the truth, instead of the usual dreadful lies this industry continues to tell itself.  If you keep reading, I'll keep writing.


    Need help opposing unneeded transmission?
    Email me


    Search This Site

    Got something to say?  Submit your own opinion for publication.

    RSS Feed

    Archives

    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    February 2012
    January 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011
    February 2011
    January 2011
    December 2010
    November 2010
    October 2010
    September 2010
    August 2010
    July 2010
    June 2010
    May 2010
    April 2010
    March 2010
    February 2010
    January 2010

    Categories

    All
    $$$$$$
    2023 PJM Transmission
    Aep Vs Firstenergy
    Arkansas
    Best Practices
    Best Practices
    Big Winds Big Lie
    Can Of Worms
    Carolinas
    Citizen Action
    Colorado
    Corporate Propaganda
    Data Centers
    Democracy Failures
    DOE Failure
    Emf
    Eminent Domain
    Events
    Ferc Action
    FERC Incentives Part Deux
    Ferc Transmission Noi
    Firstenergy Failure
    Good Ideas
    Illinois
    Iowa
    Kansas
    Land Agents
    Legislative Action
    Marketing To Mayberry
    MARL
    Missouri
    Mtstorm Doubs Rebuild
    Mtstormdoubs Rebuild
    New Jersey
    New Mexico
    Newslinks
    NIETC
    Opinion
    Path Alternatives
    Path Failures
    Path Intimidation Attempts
    Pay To Play
    Potomac Edison Investigation
    Power Company Propaganda
    Psc Failure
    Rates
    Regulatory Capture
    Skelly Fail
    The Pjm Cartel
    Top Ten Clean Line Mistakes
    Transource
    Washington
    West Virginia
    Wind Catcher
    Wisconsin

Copyright 2010 StopPATH WV, Inc.