"Clean" Lines Are a Dirty Lie

8/14/2012

0 Comments

 
It didn't take long for the peanut gallery to chime in with misguided and ignorant comments about the cancellation of PATH and MAPP.

Trade press suck-up Transmission Hub gathered the most benighted opinions it could find to create Potential PATH and MAPP cancellations unlikely to have cascading effects.  All of these sources are unfamiliar with the transmission projects and PJM's transmission planning process, and apparently PJM's reasons for canceling the projects as well.

PJM canceled the projects because demand has fallen and new generation has been planned closer to load.  This scenario isn't unique to PJM or the DC metro area.  It's happening all over the country because the way we produce and use energy is in a state of flux.  Consumers are becoming more energy efficient, which is a change that is permanent, despite PJM's posturing about "the economy."  Consumers are also investing in their own smart, power producing investments by deploying their own solar or other home-based renewable energy generation systems.  Small-scale, local renewables are being developed, which opens the door to a distributed generation future.  What is distributed generation?  It's the development of many small generators located as close to load as possible.  Distributed generation provides real reliability due to its ability to pull power from a network of local resources.  If one generator is down, it simply pulls from another located close by.  In contrast, interstate transmission lines rely on large-scale, centralized generation and the wheeling of power over long distances.  The greater the distance electricity must travel, the greater the risk of transmission failure.  Relying on just a few large, centralized generators is also risky.  Real reliability cannot be found in utility scale renewables shipped hundreds or thousands of miles from the point of generation.  This is why transmission projects are failing, and the cascade of failure will continue.

The for-profit utilities are scared.  A distributed generation future means their old business model (and their companies, unless they adapt to change) will die.   They are currently engaged in a scheme to secure a new foothold in centralized generation and re-purpose themselves as energy traders by investing in a new web of unneeded transmission lines, ostensibly to transport "wind" from the central part of the country to both coasts where the majority of the load is located.  The Transmission Hub article tells these silly utilities what they want to hear, and not the truth they need to hear.  Let's take a look at some of the stupidity behind the opinions in the article.

Jimmy Glotfelty, executive vice president of external affairs for Clean Line Energy, tries to greenwash the PATH project and re-purpose it to transport the "wind" his company intends to move from the Midwest via a series of merchant HVDC lines that total thousands of miles and will cost billions of dollars.

“At least one of these lines would be beneficial for satisfying state public policy goals, moving renewable energy from west to east,” Glotfelty said.

He was joined in his preposterous pity party by Jolly Hayden, mouthpiece for land-based wind's front group.

"He added that it would make sense for PJM to delay a decision on the PATH and MAPP lines until after the compliance filing, in order to take into consideration states' public policy goals.

If PJM's board of managers does ultimately approve the staff's recommendation and shelve the projects, MAPP and PATH may nevertheless need to be revisited, Glotfelty and Hayden said.

“I don't believe for a second that these projects will never be built,” Glotfelty said. “I believe they'll be back on the board – at least one of them will be – in the near future. The question is why should an RTO have it in a transmission plan for a couple of years and then pull it? If it's going to get put back in or if there's a likelihood it's going to be back in, shouldn’t you just get on with it now?”

Furthermore, as conditions within PJM have changed to the potential detriment of PATH and MAPP, they may change later in favor of the projects.

“In the end, this is why entities like PJM were created – to look at the big picture, on a regional basis, and decide what infrastructure is needed at the moment,” Hayden said. “Certainly, PJM should not shut the door on these projects for good. Moving forward, the need to enhance our transmission system is still very much there.”


Let's examine Glotfelty's "clean" line business model.  These transmission projects will be privately funded by investors and rely on there being an economic need to transport the product.  Merchant lines are purely speculative ventures.  They build a transmission line and then sell "subscriptions" to generators on one end and load serving entities on the other.  In order to sell the electricity, the product would have to be cheaper than competing sources at load.  Glotfelty is pushing a "clean" wind-only product, however, when one of his projects recently asked FERC if they could give preference to "renewable" generation subscribers, FERC denied their request.

"We do not approve, however, Rock Island’s request to apply a preference for energy from renewable resources in its open season. Rock Island argues generally that public policy considerations and its need to attract support from stakeholders such as environmental organizations justify such a renewable energy preference. We find that Rock Island’s general arguments do not sufficiently explain how distinctions between renewable energy resources and other types of generators justify its requested preferential treatment in an open season for initial transmission capacity. The Commission has not previously approved the inclusion of a preference for energy from renewable resources in a transmission owner’s open season criteria, and Rock Island has failed to provide sufficient justification to do so here."

So, how can Glotfelty guarantee a "clean" product that will meet state public policy goals at the load end of the line and would justify the higher price of electricity transported by these "clean" lines?  Answer - he can't.  The "clean" lines will be subscribed by cheaper coal-fired generation strategically located near the Powder River Basin, and deliver it to the big cities at a higher cost than dirty electricity sourced from more localized coal-fired generators.  Glotfelty believes that PJM should either continue to hold the PATH project in suspension, or just go ahead and build it anyhow, so that it will be there in the future to serve as a convenient highway to transport his dirty product to Maryland.  However, Glotfelty's "clean" line is a dirty lie, and "Clean" Line Energy's business model is an impossible dream that will never become reality.  Wake up, Jimmy, PATH is not needed, for your projects that will never become reality, or for any other reason.
0 Comments



Leave a Reply.

    About the Author

    Keryn Newman blogs here at StopPATH WV about energy issues, transmission policy, misguided regulation, our greedy energy companies and their corporate spin.
    In 2008, AEP & Allegheny Energy's PATH joint venture used their transmission line routing etch-a-sketch to draw a 765kV line across the street from her house. Oooops! And the rest is history.

    About
    StopPATH Blog

    StopPATH Blog began as a forum for information and opinion about the PATH transmission project.  The PATH project was abandoned in 2012, however, this blog was not.

    StopPATH Blog continues to bring you energy policy news and opinion from a consumer's point of view.  If it's sometimes snarky and oftentimes irreverent, just remember that the truth isn't pretty.  People come here because they want the truth, instead of the usual dreadful lies this industry continues to tell itself.  If you keep reading, I'll keep writing.


    Need help opposing unneeded transmission?
    Email me


    Search This Site

    Got something to say?  Submit your own opinion for publication.

    RSS Feed

    Archives

    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    February 2012
    January 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011
    February 2011
    January 2011
    December 2010
    November 2010
    October 2010
    September 2010
    August 2010
    July 2010
    June 2010
    May 2010
    April 2010
    March 2010
    February 2010
    January 2010

    Categories

    All
    $$$$$$
    2023 PJM Transmission
    Aep Vs Firstenergy
    Arkansas
    Best Practices
    Best Practices
    Big Winds Big Lie
    Can Of Worms
    Carolinas
    Citizen Action
    Colorado
    Corporate Propaganda
    Data Centers
    Democracy Failures
    DOE Failure
    Emf
    Eminent Domain
    Events
    Ferc Action
    FERC Incentives Part Deux
    Ferc Transmission Noi
    Firstenergy Failure
    Good Ideas
    Illinois
    Iowa
    Kansas
    Land Agents
    Legislative Action
    Marketing To Mayberry
    MARL
    Missouri
    Mtstorm Doubs Rebuild
    Mtstormdoubs Rebuild
    New Jersey
    New Mexico
    Newslinks
    NIETC
    Opinion
    Path Alternatives
    Path Failures
    Path Intimidation Attempts
    Pay To Play
    Potomac Edison Investigation
    Power Company Propaganda
    Psc Failure
    Rates
    Regulatory Capture
    Skelly Fail
    The Pjm Cartel
    Top Ten Clean Line Mistakes
    Transource
    Valley Link Transmission
    Washington
    West Virginia
    Wind Catcher
    Wisconsin

Copyright 2010 StopPATH WV, Inc.